Staging

Assessed

Métro 2sur4

star star star star_border star_border
help_outline

'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Team for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
20 assessments

Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

un métro très concurrentiel par rapport à la voiture et non polluant

Lever of action
Energy efficiency
Sector
Transport
Discover our scope of action arrow_forward
Submission date December 11, 2020 Founders Patrice Colsenet

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

Le métro actuel est beaucoup moins rapide pour l’usager que la voiture, le voyageur prend souvent la voiture.

How is the problem solved?

le métro 2sur4 est 50% plus rapide, donc c’est très intéressant pour le voyageur, comme le sont actuellement les TGV.

What is the customer target?

• Aux grandes métropoles, avec des métros, Paris, Lyon, Lille, Londres New York, Madrid… Alstom, Keolis, IDF Mobilité, RATP Dev, SNCF, Systra, Thales, Transdev

How is this solution different?

Les Métros de New York ou Seoul avec un métro local et un métro express, doivent pouvoir se doubler et ont des contraintes de vitesse commerciale différente. Le métro 2sur4 a toujours la même vitesse commerciale donc n’a pas besoin de voie spéciales pour doubler