Staging

Assessed

Chantier R

star star star_border star_border star_border
help_outline

'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Team for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
57 assessments

Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

La préservation des ressources par l'innovation sociale

Lever of action
Energy efficiency
Sector
Buildings
Discover our scope of action arrow_forward
Submission date February 23, 2023 Founders Frédéric Eiselé Development location Lyon, France

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

Protection des ressources (économie circulaire)

How is the problem solved?

Optimisation du tri à la source 7 flux sur chantier

What is the customer target?

Aux entreprises du secteur du bâtiment & Collectivités

How is this solution different?

Aucune solution de ce type est proposée sur le Grand Lyon