Staging
'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :
Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.
TAUR démultiplie la chaine de valeur de ses clients en mode « as a service » en optimisa
transporter et livrer des charges lourdes
Créer une gamme de plateformes, 100% électriques, modulables pour transporter des charges lourdes
Logisticiens, gestionnaire déchets et entreprises du BTP
5 plateformes modulables et 6 systèmes de navigation