Staging

Assessed

La corps

star star star star_border star_border
help_outline

'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Team for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
19 assessments

Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

Un bureau d’études en bâtiment préoccupé par le respect de l’environnement

Lever of action
Energy efficiency
Sector
Buildings
Discover our scope of action arrow_forward
Submission date January 14, 2021 Founders Guillaume Challet Development location France

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

Construction de 42 logements passifs

How is the problem solved?

En projettant de construire ce bâtiment

What is the customer target?

Des bailleurs sociaux

How is this solution different?

Pas de chauffage