'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Team for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
52 assessments

Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

Clean energy anytime anywhere

Lever of action
Zero emissions
Sector
Energy
Discover our scope of action arrow_forward
Submission date October 06, 2022 Founders Matthias Vanoni Development location Montreux, Suisse, Norway

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

Production d'électricité sans émission, n'importe où, n'importe quand, au meilleur coût du marché

How is the problem solved?

La technologie dite KPP transforme un mouvement entretenu dans une colonne d'eau en électricité avec un rendement de 90 %

What is the customer target?

Toute entreprise consommatrice d'électricité (ex. industrie de l'hydrogène) et toute entreprise productrice d'énergie (ex. EDF, Total)

How is this solution different?

Les centrales KPP peuvent être implémentées n'importe où (pas besoin de vent ou de soleil) et fonctionnent de manière pilotable (!)