Staging

Assessed

LEPIDOS

star star star_border star_border star_border
help_outline

'Team points' are awarded according to the adequacy of the solution with the type of innovations sought by Team for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Team for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
29 assessments

Submitted for assessment : After checking that an innovation is within the scope of the 20 issues Team for the Planet targets and that it has reached a sufficient maturity, the innovation is being assessed.

Un tunnel de dépollution à un prix abordable

Lever of action
Capture
Sector
Transport
Discover our scope of action arrow_forward
Submission date May 02, 2021 Founders guillaume desrocques Development location France

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

pollution atmosphérique et rupture territoriale

How is the problem solved?

en captant les polluants à faible cout

What is the customer target?

Aux collectivités locales urbaines denses

How is this solution different?

efficacité et coût